Edge Sources Service Migration

Proposal for edge-sources-service migration/modernization

Summary

Proposal for the migration and modernization of the edge-sources-service.

Rationale

[To be filled in - reasons for this change]

Key benefits expected:

  • [List expected benefits]

Affected Applications

No applications currently associated with this proposal.

Impact

Services Affected

  • Edge sources service
  • [List additional services and dependencies]

Technical Considerations

  • API compatibility with existing consumers
  • Sources data accuracy and synchronization
  • Performance and response time requirements
  • Caching strategy for sources information

Data Considerations

  • Sources data storage and updates
  • Data consistency across systems
  • Data source integration
  • Master data management

Implementation Plan

Phase 1: Assessment & Design

  • Document current service functionality
  • Identify all consumers and integration points
  • Evaluate target architecture/platform
  • Assess data migration requirements
  • Define migration strategy
  • Create proof of concept

Phase 2: Development

  • Set up new infrastructure
  • Implement/migrate core functionality
  • Configure API endpoints
  • Set up authentication and authorization
  • Implement monitoring and logging
  • Create comprehensive test suite

Phase 3: Migration

  • Deploy to staging environment
  • Integration testing with consumers
  • Performance and load testing
  • Data validation testing
  • User acceptance testing
  • Security review
  • Create rollback procedures

Phase 4: Cutover

  • Deploy to production
  • Gradual traffic migration
  • Monitor service health and performance
  • Update consumer configurations
  • Decommission old infrastructure
  • Archive legacy documentation

Risks & Mitigation

RiskImpactMitigation
Service disruptionHighGradual cutover with parallel running systems
Sources data inconsistencyHighThorough data validation and testing
Performance degradationMediumLoad testing and capacity planning
Integration breakageHighExtensive integration testing before cutover
Data source synchronization issuesMediumImplement robust data sync mechanisms

Timeline

[To be determined]

Status

Current Status: Draft

History:

  • 2025-12-22: Proposal created
Last modified February 5, 2026: Adds proposal summary (2c393ca)