Universal Geo Service Migration

Proposal for universal-geo-service migration/modernization

Summary

Proposal for the migration and modernization of the universal-geo-service.

Rationale

[To be filled in - reasons for this change]

Key benefits expected:

  • [List expected benefits]

Affected Applications

Impact

Services Affected

  • Universal geo service
  • [List additional services and dependencies]

Technical Considerations

  • API compatibility with existing consumers
  • Geographic data accuracy and coverage
  • Performance and response time requirements
  • Caching strategy for geo lookups

Data Considerations

  • Geographic data storage and updates
  • Data accuracy and validation
  • Third-party data sources and licensing

Implementation Plan

Phase 1: Assessment & Design

  • Document current service functionality
  • Identify all consumers and integration points
  • Evaluate target architecture/platform
  • Assess data migration requirements
  • Define migration strategy
  • Create proof of concept

Phase 2: Development

  • Set up new infrastructure
  • Implement/migrate core functionality
  • Configure API endpoints
  • Set up authentication and authorization
  • Implement monitoring and logging
  • Create comprehensive test suite

Phase 3: Migration

  • Deploy to staging environment
  • Integration testing with consumers
  • Performance and load testing
  • Data validation testing
  • User acceptance testing
  • Security review
  • Create rollback procedures

Phase 4: Cutover

  • Deploy to production
  • Gradual traffic migration
  • Monitor service health and performance
  • Update consumer configurations
  • Decommission old infrastructure
  • Archive legacy documentation

Risks & Mitigation

RiskImpactMitigation
Service disruptionHighGradual cutover with parallel running systems
Geographic data accuracy issuesHighThorough data validation and testing
Performance degradationMediumLoad testing and capacity planning
Integration breakageHighExtensive integration testing before cutover
Third-party dependency issuesMediumEvaluate and test all external dependencies

Timeline

[To be determined]

Status

Current Status: Draft

History:

  • 2025-12-22: Proposal created
Last modified February 5, 2026: Adds proposal summary (2c393ca)